Design, manufacture and construct a two-story office building on an oil storage facility in the port of Mombasa.
Key Points
- The design team worked with the client and produced the designs.
- Manufactured and shipped the custom units from China to Mombasa.
- Site Preparation.
- A team of 20 assembled the units in 3 Months.
- Internal finishes, electrics, and plumbing installed